PW-10/20 special for cylinder constructions
PW-10/20 This twin mast platform of the light series PW-20 was used for the construction of cylinder pieces with 1.8 and 2 meters of diameter.
In addition it was an assembling mounting in a ditch more than 10 meter deepness and in a very corrosive ambient.
With this specially conditions, the engineer Department from SALTEC designed an specific machinery. Using the same drive units that the standard machine, the engineer worker designed structures, retractable boarding ramps and special protection handrail. Also the levelling system was adapted in a special way for the new disposition of tower.
This is a clear example that the customer of TORGAR is not only buying a sturdiness and reliable machine but also have the inestimable add value from the technical support and the experience from SALTEC to solve even special aplications that can appear.
|